S. No. Name of Project Client Year Value in Lacs
1 Construction of roadbed, major and minor bridges and track linking (excluding supply of rails and sleepers), S&T and General Electrical work in Swarupganj-Aburoad (26.0 km) in Ajmer Division of North Western Railwayt Rail Vikas Nigam Limited 2014-16 9423.00
2 Two-Lanning of Paved Shoulder of Bhilwara – Ladpura Section of NH-758 (Length 67.750 Kms.) on EPC Basis in the State of Rajasthan Under NHDP-IV NHAIGovt. of India 2014-15 18449.99
3 “Rehabilitation and Up-gradation of Sendhwa- Khetia section of SH-36 from Existing Chainage Km. 0/00 to Km. 57/300 (Design length 57.165 km) to two lane with paved/hard shoulder road in the state of Madhya Pradesh on Engineering Procurement and Construction (EPC) mode.” MPRDC Bhopal 2015-17 11311.00
4 “Rehabilitation and Up-gradation of Sujhalpur Akodia Sarangpur section of SH-36 from Existing Chainage Km. 0/00 to Km. 38/600 (Design length 38.460 km) to two lane with paved/hard shoulder road in the state of Madhya Pradesh on Engineering Procurement and Construction (EPC) mode.” MPRDC Bhopal 2015-17 8125.00
5 Construction of Northern Kota bypass of two lane with paved shoulders configuration starting from Design Ch 0.000 to Design Ch 14+300 Package-I & II in the state of Rajasthan on Engineering, Procurement & Construction (EPC) mode.” Urban Improvement Trust, Kota 2015-17 12101.00
6 Four Laning of Shivpuri-Guna section of NH-3 from Km.236.000 to Km.332.100 (Existing Chainage) in the state of Madhya Package - 2 , From Ch. 55.31 to Ch.85.31(km 319.7) - Design Chainage IRCON International Limited 2016-17 15410.00